Lastmanagement für Wallboxen: Der DaheimLaden LastManager

More and more buildings require an intelligent solution to manage charging processes due to the growing number of electric vehicles—especially when multiple EV chargers are in use simultaneously. This is exactly why we developed the DaheimLaden LoadManager: a compact, scalable solution for intelligent load management in apartment buildings, underground parking garages, and homeowners’ associations (WEGs).


The DaheimLaden LoadManager is the key to an independent and decentralized charging infrastructure. It combines the benefits of on-site physical power measurement with the need for overarching load management—without restricting the end user’s flexibility.

Contents

  • How does the DaheimLaden LoadManager work?

  • Highlights of the LoadManager

  • Wallbox Load Management in Apartment Buildings, Underground Garages, and WEGs

  • PV Surplus Charging with the LoadManager

  • Network Integration

  • Load Management Software

How does the DaheimLaden LoadManager work?

The DaheimLaden LoadManager is installed directly on the DIN rail (4 modules) and measures the building’s total power consumption. It distributes the available power as needed to up to 25 EV chargers (linearly scalable—e.g., 50 EV chargers require 2 LoadManagers). The charging power is adjusted to the available energy, ensuring all vehicles can charge safely without overloading the building’s main connection.


Highlights of the DaheimLaden LoadManager

  • Compatibility: Fully compatible with ALL DaheimLaden EV chargers (forward and backward).

  • Scalability: Manages up to 25 DaheimLaden EV chargers per LoadManager, linearly scalable (e.g., 50 wallboxes require 2 LoadManagers).

  • PV Surplus Function: Includes hybrid mode and timed mode switching.

  • Direct or Transformer Measurement: Up to 63A via direct measurement; above 63A via transformer measurement.

  • Easy Installation: Mounted on a DIN rail (4 modules).

  • Offline Operation: Fully functional offline, with optional internet connectivity for additional software features.

  • Connection: Uses Cat7 cabling (additional router required).

  • Control & Connectivity: Wallbox control via LAN/WLAN—no additional control cables needed.

  • EEBus Capable: Simplifies compliance with §14a EnWG (German Energy Industry Act).


All technical details can be found on the product page:


EV charger Load Management in Apartment Buildings, Underground Garages, and WEGs


In most apartment buildings—especially in underground garages or shared parking areas—wallboxes are connected directly to the residents’ individual electricity meters.

The challenge: When multiple or all EV chargers are used simultaneously for charging, the total load can overload the building’s main connection. This is where the DaheimLaden LoadManager comes in. It is centrally connected near the general electricity meter and performs a transformer measurement in the unmetered part of the main connection.

Lastmanagement für bis zu 25 Wallboxen Infografik

This allows the LoadManager to monitor the building’s current total consumption at all times. You input the maximum connection capacity into the associated software, and the LoadManager automatically regulates the maximum charging power of the EV chargers to prevent overloads.

This ensures that smart EV charger features such as company car billing, charging timers, or dynamic electricity tariffs remain fully usable—only during temporary load peaks will the charging power be automatically reduced.


Since January 1, 2024, §14a EnWG mandates that wallboxes must be controllable by the grid operator. The LoadManager meets this requirement via an EEBus interface, eliminating the need for additional control cables. This significantly reduces installation complexity and costs.


Are you planning charging infrastructure for an apartment building or looking to expand an existing system? We support you with expertise, concepts, and technology—from the initial idea to the final screw. Let’s find out together what’s possible for your homeowners’ association—simply send us an email or give us a call:






PV Surplus Charging with the LoadManager—for Large and Small Installations

The DaheimLaden LoadManager not only measures the building’s power consumption but also captures the currently produced solar energy in typical partial-feed PV systems. This creates a complete energy balance, based on which the LoadManager intelligently and efficiently distributes surplus PV power to one or multiple charging points.

Three flexible charging modes are available:

Lastmanagement für bis zu 25 Wallboxen Infografik
  1. Pure PV Mode: The goal is to charge the vehicle battery with up to 100% PV power. For example, if your PV system generates a 6 kW surplus, your vehicle will charge at exactly that power level—without drawing from the grid. This achieves zero feed-in and

    maximizes the use of your self-generated electricity without purchasing grid power.

  2. Min+PV Mode: Electric vehicles require a minimum charging current of 6 A. In pure PV mode, charging pauses if less than 6 A of PV power is produced. This can lead to no charging for days, especially in darker seasons. In Min+PV mode, charging always occurs at a minimum of 6 A—even without surplus, using grid power if necessary. As PV output increases, the charging power dynamically adjusts. Ideal for reliable and predictable charging.

  3. Timer-Based PV Mode: For even greater flexibility and reliability, this mode uses PV mode during the day and grid mode at night. This allows efficient charging with PV power during the day without additional grid draw while ensuring your vehicle is fully charged by morning. This feature is particularly useful for fleet management but is equally suitable for individual installations.


Network Integration for EV charger Load Management

Verwaltung des Lastmanagements über Lastmanager mit netzwerkanbindung

The DaheimLaden LoadManager connects to the EV chargers via a local network and takes over the control of charging processes. Communication occurs via star-shaped LAN cabling on TCP standard—no additional control lines are required.

This simple and stable structure makes installation particularly efficient and cost-effective. Control commands are sent directly from the LoadManager to the respective charging points—for reliable, intelligent load management without unnecessary complexity.

With an additional internet connection, extended DaheimLaden software features become available, such as user/vehicle-specific reports, charging timers, remote start/stop, and more.

LoadManager Software

The LoadManager displays the local energy balance in real-time on the dashboard, including individual phase values. The SmartMeter module allows tracking of active power and energy. The Wallbox module handles the setup, display, and control of DaheimLaden wallboxes.

Dashboard -alle  Leistungsdaten im Überblick
Dashboard: All performance data at a glance.

Smart Meter - Monitoring der Leistung pro Phase in Echtzeit
Smart Meter: Real-time monitoring of power per phase.

Wallbox Monitor - intelligente Steuerung mehrerer Wallboxen
Wallbox Monitor: Intelligent control of multiple wallboxes.

Wallbox Lademodus - der Betriebsmodus kann einfach zwischen PV-Laden, Netzladen und Hybrid-Laden gewechselt werden
Wallbox Charging Mode: Easily switch between PV charging, grid charging, and hybrid charging.

Interested in more details?

Find technical specifications, sample connection plans, and installation steps in our manual:



Commentaires


DaheimLaden online shop

Daheimladen Logo

For over four years, we have proudly established ourselves as a leading German manufacturer of charging infrastructure for electric vehicles. We stand for affordable, intelligent, and scalable EV chargers for private, commercial, and public use.

At the heart of our offering are the DaheimLader EV chargers. Our innovative solutions are characterized by comprehensive software features and seamless integrations, making charging your electric vehicle not just reliable but an exceptional experience – all while supporting a sustainable energy mix.

Our headquarters in Schwetzingen, near Mannheim, is where our vision becomes reality.

  • Facebook
  • Instagram
  • LinkedIn
  • Youtube

Do you have questions?
We are here for you Monday to Thursday from 9:00 AM to 12:00 PM and 1:30 PM to 5:00 PM, and on Fridays from 9:00 AM to 12:00 PM and 1:30 PM to 3:00 PM.​​

online shop​​

Charging cable

Stand & accessories

Installation

Instructions

Guarantee

EV chargers

Software functions

About Us

Reviews

Jobs

Download the DaheimLaden app

google-play-badge__1_.png

Software functions

Pay securely

Paypal Logo
Google Pay Logo

© 2024 New Inergy GmbH

Imprint

Data protection

bottom of page